Research Contracts
Home

 

Research Contracts:

bulletTriton Engineering, Rock Testing, 1998, $7,357, 50%     
bulletUM Research Board, Multivariate Analysis of Bore Hole Discontinuity Data, 1998, $27,000, 100%
bulletUniversity Transportation Center, Feasibility Study: Concrete Roughness Measuring Device, 1999, $4300.00, 100%
bullet MODOT, Seismic Hazards Study, S. E. Missouri., 1999, $260,520, 5%
bullet NSF, Multivariate Analysis of Bore Hole Discontinuity Data, 1999, $84,522, 100%
bullet American Concrete Institute, Development of a Prototype Concrete Roughness Device, 1999, $11,500, 100%.
bullet University Transportation Center, Development of a Prototype Concrete Roughness Device, 1999, $11,500, 100%.
bullet FHWA, Bridge Deck Remediation, 1999, $650,000, 6%.
bulletTRB IDEA, Automated Mobile Highway Sign Retroreflectivity, 2001, $73,075, 100%
bulletTRB IDEA, Aggregate Shape Characterization Using Digital Image Processing, 2001, $72,755, 50%
bulletUM Research Board, Mobile Vision System for Highway Rockcut Stability, 2001, $29,000, 100%
bulletNSF, FRP Concrete Repair Surface Preparation and Characterization, 2002, $107,375 33%
bulletAppleyard Endowment, Seed Funding For Pavement Stripe Retroreflectivity Measurement, 2002, $1,800, 100%
bulletUniversity Transportation Center, Non-Destructive Ultrasonic Detection of FRP De-lamination, 2002, $8,639.00, 100%
bulletUniversity Transportation Center, FRP Alignment Measurement Using Digital Image Analysis, 2002, $5,735.00, 100%
bulletFBI,  Disjointed fractured surface Characterization Using Digital Image Processing, 2002, $172,277, 100%
bulletMODOT, Development of a Highway Rock Cut Rating System For Missouri Highways, 2003, $44, 864, 100%
bulletMODOT/UTC, Preservation of Missouri Transportation Infrastructure: Flexural Upgrade of Deficient Bridges with Composites, 2003, $1,179,458, 6%.
bulletDept. of Defense, Blast Testing and Research - Bridge at the Tenza Viaduct, 2005, $400,000, 3%.
bulletLeica/UTC, Acquisition of a LIDAR unit, 2007, $200,819, 100%
bulletNSF, SGER/Collaborative Research, 2008 Midwest levee Failure Investigation, 2008, $42,969, 20%.
bulletLeonard Wood Institute, Visualizing and Modeling Interior Spaces of Dangerous Structures, 2008, $395,643, PI, 50%
bulletMODOT/UTC, Transportation Geotechnics Research Program, 2008, $1,375,000, 12.5%
bulletNSF, Extracting 3-D Fracture Orientations for Rock Failure Analysis by Combining Optical Imaging and LIDAR scanning technologies, 2009, $274,876, PI, 50%.
bulletMODOT/UTC, Geophysical Surveys Along the New Route 50 Alignment, 2010, $10,000, PI, 50%.
bulletUM Research Board/UTC. Development of a Quantitative Model for the Mechanism of Raveling Failure in Highway Rock Slopes and Cuts, 2011, $38,699, PI, 50%.
bulletTOYON, Visible Electro-Optical (EO) System and LIDAR Fusion for Low Cost Perception by Autonomous Ground Vehicles, 2011, $25,000, PI, 100%.