Hoover Dam
Hoover Dam Black Canyon Boulder Dam Boulder
Canyon Act Boulder Canyon Project Colorado River Boulder City Lake Mead grout
curtain failure of grout curtain construction significance Six Companies
Bureau of Reclamation Frank Crowe Elwood Mead Walker Young Herbert Hoover
river diversion Boulder Canyon Project Colorado River Compact Colorado River
Board Lake Cahuilla Owyhee Dam
Imperial Valley F. L. Ransome Chester Longwell Claude Birdseye Mass concrete
Cableways Hard hats Board of Consulting Engineers Instrumentation Carlson
stress meters Carlson strain gages
Death toll Dedication Franklin Roosevelt Name controversy Storage capacity
Spilling of Lake Mead Cavitation Spillway cavitation Camouflage Basic Magnesium
plant Reservoir induced seismicity
Reservoir siltation Reservoir area and capacity Lake Mead sediment Lake Mead
National Recreation Area
-Hoover
Dam: Impacts on the Engineering Profession,
America, and the World
(.PDF of 90 Slide PowerPoint Presentation -
32 MB)
-Hoover
Dam: Grout Curtain Failure
(.PDF of 49 Slide PowerPoint Presentation - 17 MB)
Hoover Dam was
the most innovative structure of its kind when it was constructed in 1931-35.
The left image shows some of the monolithic pour blocks, which accomodated up
to five feet of mass
concrete at a time, before stopping to allow curing. The view at right
shows the 8 foot wide slot in
the dam's centerline used to convey temporary cooling pipes to the dam's interior.
This was grouted
in 100 foot increments as the dam concrete cured. The last
concrete placed in the
dam was into this slot along the dam's crest on May 29, 1935.
-Hoover Dam Impacts
(.PDF of 84 Slide PowerPoint Presentation)
The spillways at Hoover Dam have operated twice, during initial testing in 1941 (right image)and during
unanticipated high flows during the summer of 1983 (left image). On both occasions, the spillways
experienced sever cavitation at the elbow transition. Aeration ducts were added by the Bureau of
Reclamation immediately following the 1983 damage and the design flood was increased from 300,000 cfs
inflow with a flood volume of 9.5 million acre-feet (estimated in 1930) to a peak inflow of 1,130,000 cfs
with a 60-day volume of 9.3 million acre-feet (revised in 1990). This presentation summarizes
some of the impacts Hoover Dam had on the engineering profession and how our understanding
of various physical variables have evolved since the dam was designed in the late 1920s.