Concrete pad for base of ramp (5/30/20 - 5/31):
Video of mixing concrete: click here
Concrete sidewalk in front of house (5/30 - 5/31):
Concrete piers for deck and ramp (5/30 - 5/31):
Video of opperating auger: click here
Final dirt and gravel work (6/6 - 6/8):
Building deck (Friday, 6/19):
Video of work that day: click here
Installing downspouts and cleanup (Saturday, 6/20):
Video of work that day: click here
Installing balusters and remaining decking screws (Sunday, 6/21):
Video of work that day: click here
Prep work for stairs and planting schrubs (7/4 - 7/5, & 8/10):
Installed stairs and final deck pictures (7/8 - 7/9, & 8/3):
Finish siding and install A/C drain through ramp (8/19 - 10/2):
Spread 2 yards of gravel under deck and around house (10/9 - 10/13):
Final outside pictures (10/23):