Strain
Gage Installation
photos
courtesy of Measurements Group
Surface Preparation for general purpose strain gage installations
(Measurements Group Instruction Bulletin B-129-7)
- Degreasing
- Abrading (sanding)
- Burnishing of layout lines
- Conditioning (remove graphite from pencil marks)
- Neutralizing
Installation should be within 30 minutes of surface preparation.
Gage Bonding of polyimide-backed gages
(Measurements Group Instruction Bulletin B-127-13)
- Gage preparation
- Gage transfer
- Catalyst application
- Gage bonding
- Tape removal
Leadwire Attachment for solder-tab, static-strain measurement gages
(Measurements Group Tech Tip TT-606)
- Leadwire stripping
- Leadwire tinning
- Gage tinning
- Leadwire attachment
- Rosin removal
Protective Coatings for laboratory environments
- Recleaning
- Treatment of vinyl and Teflon insulated leadwires
- Coating application (various types)