Phase 1 Results

 

I was pleased with the results.  The average level of learning appeared good (similar to homework and test format).  The results were very diverse.

 

 

Background

 

 

 

Choices

 

 

 

Analysis

 

 

 

Wind and Seismic

 

 

 

Typical Solution Steps

 

  1. Designer's background
  2. Building choices
    1. location, terrain, wind exposure, etc 
    2. sample or custom design
    3. drawings:  isometric, floor plan, etc
    4. dimensions:  length, width, height, etc
    5. list of materials 
  3. Dead Loads
    1. density of SPF vs DF-L
    2. roof 
    3. ceiling 
    4. floor/ceiling
    5. floor 
    6. pony wall 
    7. exterior wall
    8. interior wall
    9. floor beam
    10. weight of sub-assemblies, entire building
  4. Live Loads
    1. vertical
      1. roof
      2. ceiling
      3. floor/ceiling
      4. floor
      5. snow
    2. horizontal
      1. wind
      2. seismic:  base shear, story forces, etc
      3. compare wind and seismic
  5. Distribution of loads (load paths)
  6. Load combinations
  7. Deflection

 

 

Dead Loads

 

Load Roof
(psf)
Ceiling
(psf)
Floor/Ceiling
(psf)
Floor
(psf)
Pony Wall
(psf)
Exterior Wall
(psf)
Interior Wall
(psf)
Building Weight
(kip)
Average 14 12 10 8 1 13 9 102

 

Load Roof
(psf)
Ceiling
(psf)
Floor/Ceiling
(psf)
Floor
(psf)
Pony Wall
(psf)
Exterior Wall
(psf)
Interior Wall
(psf)
Building Weight
(kip)
Range 3.5
5.5
5.5
5.7
7.9
8.3
9.9
10.4
14.0
14.0
14.1
14.1
14.6
15.0
15.5
15.7
17.4
20.0
20.9
21.9
22.0
31.3
1.9
5.6
6.3
6.5
7.0
7.4
8.0
12.0
12.0
12.0
12.0
12.0
18.9
25.7
26.6
4.5
4.7
4.7
4.8
6.9
7.6
7.9
8.8
9.0
11.0
11.0
11.8
13.1
29.8
4.6
4.7
4.7
4.7
4.7
4.8
4.8
4.8
4.8
5.4
6.0
6.7
6.8
7.9
7.9
8.7
12.4
14.1
25.0
0.8
0.9
0.9
0.9
0.9
4.3
3.4
5.8
7.3
8.7
10.8
11.9
12.0
12.0
12.0
12.0
12.0
12.1
13.3
13.4
15.0
15.6
15.8
17.6
32.3
3.4
3.4
5.2
5.9
5.9
5.9
5.9
7.1
8.0
8.0
20.0
20.0
20.0
58.5
64.8
69.3
83.2
92.4
104.5
106.5
106.9
128.0
132.5
173.0

Non-psf and unreasonable numbers omitted.

 

Live Loads

 

Load Roof
(psf)
Ceiling
(psf)
Floor/Ceiling
(psf)
Floor
(psf)
Snow
(psf)
Base Shear
(kip)
Average 17 17 32 33 20 28

 

Load Roof
(psf)
Ceiling
(psf)
Floor/Ceiling
(psf)
Floor
(psf)
Snow
(psf)
Base Shear
(kip)
Range 12.0
12.0
12.0
12.0
12.0
13.0
13.3
14.5
15.0
16.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
0.0
0.0
10.0
10.0
12.0
12.0
19.5
20.0
20.0
40.0
40.0
21.6
21.6
21.6
26.4
26.4
30.0
30.0
40.0
40.0
40.0
40.0
40.0
21.6
21.6
21.6
26.4
26.4
29.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
0.0
0.0
9.0
9.1
9.8
10.0
11.1
11.2
11.2
11.6
11.6
11.9
12.0
12.6
12.6
14.0
14.0
16.0
17.6
18.0
20.0
20.0
20.0
20.0
21.6
25.0
63.0
151.0
1.22
2.10
3.10
4.03
4.60
20.35
29.79
42.60
58.90
116.20

Non-psf and unreasonable numbers omitted.

 

 

Blackboard My Grades

 

Phase 1 Grade  (max of 100 points)
 
Phase 1 Introductory Information (30 points)
Phase 1 Dead Loads  (35 points)
Phase 1 Live Loads  (35 points)
 
Phase 1 Wow Factor  (extra credit)
 
Phase 1 Total Points (intro + dead + live + wow)