Phase 1 Results
I was pleased with the results. The average level of learning appeared good (similar to homework and test format). The results were very diverse.
Background
- 30% have some construction experience.
- 7% have some wood-design experience.
Choices
- 30% were custom designs.
- 70% were the sample design (many with modifications).
- Several geographic locations.
- Fewer load calculations for custom designs.
- Two or three designs had trusses.
- One design had glulams.
- One design had SIPs.
- One design had timber-frame.
Analysis
- 20% considered beams (e.g. floor beam in sample design).
- 17% considered difference in species density.
- 47% considered load combinations.
- 40% looked at load flow through structure (several with load-path images).
- 10% considered deflection.
Wind and Seismic
- 87% had wind analysis.
- 63% had seismic analysis.
- 10% looked at whether wind or seismic controlled.
Typical Solution Steps
- Designer's background
- Building choices
- location, terrain, wind exposure, etc
- sample or custom design
- drawings: isometric, floor plan, etc
- dimensions: length, width, height, etc
- list of materials
- Dead Loads
- density of SPF vs DF-L
- roof
- ceiling
- floor/ceiling
- floor
- pony wall
- exterior wall
- interior wall
- floor beam
- weight of sub-assemblies, entire building
- Live Loads
- vertical
- roof
- ceiling
- floor/ceiling
- floor
- snow
- horizontal
- wind
- seismic: base shear, story forces, etc
- compare wind and seismic
- Distribution of loads (load paths)
- Load combinations
- Deflection
Dead Loads
Load Roof
(psf)Ceiling
(psf)Floor/Ceiling
(psf)Floor
(psf)Pony Wall
(psf)Exterior Wall
(psf)Interior Wall
(psf)Building Weight
(kip)Average 14 12 10 8 1 13 9 102
Load Roof
(psf)Ceiling
(psf)Floor/Ceiling
(psf)Floor
(psf)Pony Wall
(psf)Exterior Wall
(psf)Interior Wall
(psf)Building Weight
(kip)Range 3.5
5.5
5.5
5.7
7.9
8.3
9.9
10.4
14.0
14.0
14.1
14.1
14.6
15.0
15.5
15.7
17.4
20.0
20.9
21.9
22.0
31.31.9
5.6
6.3
6.5
7.0
7.4
8.0
12.0
12.0
12.0
12.0
12.0
18.9
25.7
26.64.5
4.7
4.7
4.8
6.9
7.6
7.9
8.8
9.0
11.0
11.0
11.8
13.1
29.84.6
4.7
4.7
4.7
4.7
4.8
4.8
4.8
4.8
5.4
6.0
6.7
6.8
7.9
7.9
8.7
12.4
14.1
25.00.8
0.9
0.9
0.9
0.9
4.33.4
5.8
7.3
8.7
10.8
11.9
12.0
12.0
12.0
12.0
12.0
12.1
13.3
13.4
15.0
15.6
15.8
17.6
32.33.4
3.4
5.2
5.9
5.9
5.9
5.9
7.1
8.0
8.0
20.0
20.0
20.058.5
64.8
69.3
83.2
92.4
104.5
106.5
106.9
128.0
132.5
173.0Non-psf and unreasonable numbers omitted.
Live Loads
Load Roof
(psf)Ceiling
(psf)Floor/Ceiling
(psf)Floor
(psf)Snow
(psf)Base Shear
(kip)Average 17 17 32 33 20 28
Load Roof
(psf)Ceiling
(psf)Floor/Ceiling
(psf)Floor
(psf)Snow
(psf)Base Shear
(kip)Range 12.0
12.0
12.0
12.0
12.0
13.0
13.3
14.5
15.0
16.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.00.0
0.0
10.0
10.0
12.0
12.0
19.5
20.0
20.0
40.0
40.021.6
21.6
21.6
26.4
26.4
30.0
30.0
40.0
40.0
40.0
40.0
40.021.6
21.6
21.6
26.4
26.4
29.0
40.0
40.0
40.0
40.0
40.0
40.0
40.00.0
0.0
9.0
9.1
9.8
10.0
11.1
11.2
11.2
11.6
11.6
11.9
12.0
12.6
12.6
14.0
14.0
16.0
17.6
18.0
20.0
20.0
20.0
20.0
21.6
25.0
63.0
151.01.22
2.10
3.10
4.03
4.60
20.35
29.79
42.60
58.90
116.20Non-psf and unreasonable numbers omitted.
Blackboard My Grades
Phase 1 Grade (max of 100 points)
Phase 1 Introductory Information (30 points)
Phase 1 Dead Loads (35 points)
Phase 1 Live Loads (35 points)
Phase 1 Wow Factor (extra credit)
Phase 1 Total Points (intro + dead + live + wow)