Sample House Component Check

 

6. Check the connection between a common stud and the bottom/sole plate in the interior wall for bearing.  (see connection homework from chapter 6)

 


from Graphic Guide to Frame Construction by R. Thallon

 

Loads PD = 750 lb
P
Lr = 380 lb
P
L = 940 lb
P
S = 340 lb
Load combination needs to be determined
Trial member size 2x4
Stress grade and species Stud Spruce-Pine-Fir (stud in interior wall), No. 2 Spruce-Pine-Fir (bottom or sole plate in interior wall)
Spacing 16 in. OC
Moisture content MC ≤ 19%
Dry-service conditions
Normal temperatures