Sample House Component Check
6. Check the connection between a common stud and the bottom/sole plate in the interior wall for bearing. (see connection homework from chapter 6)
from Graphic Guide to Frame Construction by R. Thallon
Loads PD = 750 lb
PLr = 380 lb
PL = 940 lb
PS = 340 lbLoad combination needs to be determined Trial member size 2x4 Stress grade and species Stud Spruce-Pine-Fir (stud in interior wall), No. 2 Spruce-Pine-Fir (bottom or sole plate in interior wall) Spacing 16 in. OC Moisture content MC ≤ 19% Dry-service conditions Normal temperatures