| |
Research Contracts:
 | Triton Engineering, Rock Testing,
1998, $7,357, 50%
|
 | UM
Research Board, Multivariate Analysis of Bore Hole Discontinuity Data, 1998,
$27,000, 100% |
 | University Transportation Center,
Feasibility Study: Concrete Roughness Measuring Device, 1999, $4300.00, 100% |
 | MODOT,
Seismic Hazards Study, S. E. Missouri., 1999, $260,520, 5% |
 | NSF,
Multivariate Analysis of Bore Hole Discontinuity Data, 1999, $84,522, 100%
|
 | American
Concrete Institute, Development of a Prototype Concrete Roughness Device,
1999, $11,500, 100%.
|
 | University
Transportation Center, Development of a Prototype Concrete Roughness Device,
1999, $11,500, 100%.
|
 | FHWA,
Bridge Deck Remediation, 1999, $650,000, 6%.
|
 | TRB IDEA, Automated Mobile
Highway Sign Retroreflectivity, 2001, $73,075, 100% |
 | TRB IDEA, Aggregate Shape
Characterization Using Digital Image Processing, 2001, $72,755, 50%
|
 | UM
Research Board, Mobile Vision System for Highway Rockcut Stability, 2001,
$29,000, 100% |
 | NSF,
FRP Concrete Repair Surface Preparation and Characterization, 2002, $107,375
33% |
 | Appleyard Endowment, Seed Funding For Pavement Stripe Retroreflectivity
Measurement, 2002, $1,800, 100% |
 | University Transportation Center, Non-Destructive Ultrasonic Detection of FRP
De-lamination, 2002, $8,639.00, 100% |
 | University Transportation Center, FRP Alignment Measurement Using Digital
Image Analysis, 2002, $5,735.00, 100% |
 | FBI, Disjointed fractured surface Characterization Using Digital
Image Processing, 2002, $172,277, 100% |
 | MODOT, Development of a Highway Rock Cut Rating System For Missouri
Highways, 2003, $44, 864, 100% |
 | MODOT/UTC, Preservation of Missouri Transportation Infrastructure:
Flexural Upgrade of Deficient Bridges with Composites, 2003, $1,179,458, 6%. |
 | Dept. of Defense, Blast Testing and Research - Bridge at the Tenza
Viaduct, 2005, $400,000, 3%. |
 | Leica/UTC, Acquisition of a LIDAR unit, 2007, $200,819, 100% |
 | NSF, SGER/Collaborative Research, 2008 Midwest levee Failure
Investigation, 2008, $42,969, 20%. |
 | Leonard Wood Institute, Visualizing and Modeling Interior Spaces of
Dangerous Structures, 2008, $395,643, PI, 50% |
 | MODOT/UTC, Transportation Geotechnics Research Program, 2008,
$1,375,000, 12.5% |
 | NSF, Extracting 3-D Fracture Orientations for Rock Failure Analysis by
Combining Optical Imaging and LIDAR scanning technologies, 2009, $274,876,
PI, 50%. |
 | MODOT/UTC, Geophysical Surveys Along the New Route 50 Alignment, 2010,
$10,000, PI, 50%. |
 | UM Research Board/UTC. Development of a Quantitative Model for the
Mechanism of Raveling Failure in Highway Rock Slopes and Cuts, 2011,
$38,699, PI, 50%. |
 | TOYON/NAVY, Visible Electro-Optical (EO) System and LIDAR Fusion for Low Cost
Perception by Autonomous Ground Vehicles, 2012, $47,000, PI, 100%. |
 | TOYON/NAVY, Visible Electro-Optical (EO) System and LIDAR Fusion for Low Cost
Perception by Autonomous Ground Vehicles, Phase 2, 2013, $150,000, PI, 100%. |
 | GE/NUTC, Acquisition of a LIDAR Scanner, 2013 $62,017, PI, 100%. |
 | MODOT/NUTC, Bridge
Hydro-Demolition Thickness Measurements, 2013, $7,500, PI, 100%. |
 | GE/NUTC,
Highway Rockfall Measurements Using LIDAR, 2013, $22,474, PI, 100%. |
 | TOYON/NAVY, Visible Electro-Optical (EO) System and LIDAR Fusion for Low Cost
Perception by Autonomous Ground Vehicles, Phase 2b, 2014, $75,000, PI, 100%. |
 | RMERC, Developing a LIDAR Based Measurement of Soft Landslide Geometry,
2015, $4,500, PI, 100% |
 | RMERC - Seed funding l for the Development of a Low Cost LIDAR Ground
Control Hazard Detection Network, 2016, PI, 100% $4,041. |
 | NIOSH - Development of a Low Cost LIDAR Ground Control Hazard Detection
Network, 2016, PI, 100% $289,904. |
 | Anclajes Y Consultoria Geotechnica - Test and Stress/Strain Analysis of
rock samples, 2016, PI, 100% $7500. |
|