News


For news, stories, and other updates about the Steel Bridge Team, check out the Experience This Blog or Facebook.

2012 Steel Bridge



Design
22 feet 7 inches long, 4 feet wide, 4 feet 6 inches tall. Weighed 227 lbs.
Constructed in roughly 18 minutes with 3 builders and 2 runners.

Awards
5th place at Regional Competition
1st place in Aesthetics

2011 Steel Bridge



Design
21 feet 1 inch long, 4 feet wide, 2 feet 9 inches tall.
Held 2500 pounds and deflected less than 1/2 of an inch across all points summed.
Constructed in roughly 20 minutes with 3 builders and 2 runners.

Awards
6th place at Regional Competition

2010 Steel Bridge



Awards
Spirit of the Conference Award

2009 Steel Bridge



Design
20 feet long, 5 feet wide, 2 feet 6 inches tall.

Awards
6th place at Regionals
1st place in display category

2008 Steel Bridge



Design
21 feet long, 4 feet wide, 6 feet tall.

Awards
3rd place at Regionals
34th place at Nationals

2007 Steel Bridge



Design
20 feet long, 4 feet wide, 7 feet tall.

2005 Steel Bridge



Design
22 feet long, 4 feet wide, 6 feet tall.
Regionals: failed lateral loading by 0.25"

2004 Steel Bridge



Design
23 feet long, 4 feet 6 inches wide, 5 feet tall.

Awards
3rd place at Regionals
12th place at Nationals

2003 Steel Bridge



Design
25 feet long, 4 feet wide, 5 feet tall.

Awards
2nd place at Regionals
28th place at Nationals

2002 Steel Bridge



Design
21 feet 6 inches long, 2 feet 6 inches wide, 3 feet 6 inches tall.